PA Turnpike / I-95 Interchange Project

Park and Ride

New Park and Ride Facility

Construction anticipated in 2017

This was the only required Congestion Mitigation Strategy from the 2003 FEIS to contruct a Park and Carpool lot close to the existing I-95, Route 413 Interchange. Site selection and design is on going and construction is anticipated in 2017.


(click to enlarge)

 

Back
to
Top