Design :: Current Design :: Route 13 Connector
Route 13 Connector
Ramp A reconstruction through new at-grade intersection with Route 13
Construction anticipated to begin Fall 2017
This section includes Delaware Valley Interchange Ramp A reconstruction up to and through a new at-grade signalized intersection with Route 13. The existing interchange bridge over Route 13 will be demolished. Construction anticipated to begin Fall 2017.

(click to enlarge)